North Cross Street Station
Youngsville, NC Restaurant Returns Building to its Fire Station Roots This building started as a fire station, then became town offices, before finally becoming its current iteration: North Cross Street Station restaurant. The town offices were located in this building before they moved to a larger facility. For this Adaptive Reuse project, our team at […]
Strike & Barrel
In downtown Wake Forest’s Renaissance Center, Strike & Barrel embarked on an ambitious expansion plan with Focus Design Builders to transform a former grocery store space into a bustling entertainment venue. Strike & Barrel is now downtown Wake Forest’s Premier entertainment destination. Their renovated space has 24,000+ square feet of fun including: bowling, axe throwing, […]
Sunbelt
In Leland, NC, near Wilmington and the coast, an aging shingle supply building awaited a revival. Focus Design Builders took on the challenge of modernizing this metal structure, addressing its unique coastal requirements on behalf of our client: Sunbelt Rentals. Sunbelt Rentals is the leader in the equipment rental industry, constantly advancing the idea of […]
Wine & Beer 101 Youngsville
Focus Design Builders took an abandoned gas station and turned it into a bottle shop and bar. The interior of the building was full of mildew and mold and the exterior was lacking in appeal. Focus developed the concept for the bottle shop and completely cleaned and disinfected the interior of the building and built […]
Loading Dock Wake Forest
Located in Wake Forest, NC, this adaptive reuse project transformed a ~100-year-old warehouse while retaining its historical elements. The steel structure, exterior walls, and concrete slabs were preserved, seamlessly integrated into the new design by the talented design team. We undertook extensive work, including replacing the plumbing, electrical systems, sprinkler system, and roof. Asbestos abatement […]
Archer Lodge Fire Department
The Archer Lodge Fire Department project consisted of interior remodeling, as well as cohesive new additions to expand upon the appearance of the existing structure. Between value engineering and budget management, Focus overcame exterior issues of the fifteen-year-old building and excavated 3-4 feet of bad soil. We maintained strict time frames given the order change, […]